Thursday, December 28, 2017

First Selfies

Frances and Mathilde, contemplating a well built wall of foam core, 16 inch on centre studs, pink fibreglass, and sealed air barrier.

Enclosed

Skating rink upgrade.





Two weeks later and the insulation is installed. It's -25C outside without the wind chill. The sun shining through the south facing windows brings the indoor temperature up to at least 10C.



First signs of plumbing. This is where the bathroom sink will hang off the wall.

Thursday, October 19, 2017

First signs

I show up one day and a driveway has appeared.


Foundation - only pictures a home owner could love.


When I first saw this, I asked Isaac why he would pour all that concrete around the exterior of the footing.  He told me it wasn't poured.  It was the limestone underneath.


It's so smooth and flat, it's like aliens created it a million years ago.


The whole view: